• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jun 2021 - Jun 2021
  • Estimated project cost $341,449
  • Australian Government contribution $341,449
  • Local Council/Shire Melbourne City Council (City of Melbourne)
  • State VIC

Project description

The road surface has fallen below the standards set by the City of Melbourne. It is exhibiting signs of fatigue with cracking and ravelling of the surface evident that will lead to further deterioration as moisture gains access to the pavement and sub-base.

Profile 50mm depth and resurface both sides of the road with 10mm type HP hot mix asphalt. Approximately 10% of the surface will require the pavement to be reconstructed prior to the asphalt resurfacing being laid.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.