• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2022 - May 2022
  • Estimated project cost $142,498
  • Australian Government contribution $142,498
  • State NSW

Project description

The existing surface is affected by various cracks, pavement failures and significant deformations due to substandard road base materials. Some failed areas have been rectified in the past by heavy patching.

The proposed treatment will include reconstruction of failed and deformed pavement areas and full road resurfacing. Length = 330 m; Width = 9.8 m; Area = 3234 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.