- Funding program Roads to Recovery Program
- Status Completed
- Transport mode Road
- Expected start/finish Jun 2022 - Jun 2022
- Estimated project cost $164,377
- Australian Government contribution $164,377
- State NSW
Project description
The existing surface exhibits wide spread areas of cracks and pavement failures. It has been patched multiple times in the past. The asphalt is old and brittle requiring frequent maintenance.The proposed treatment will include repair o pavement failures by heavy patching and road resurfacing with asphalt. Length = 350 m; Width = 9.8 m; Area = 3430 m2
Project last updated:
Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.