Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Major Projects Business Case Fund
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Successful Projects under the Active Transport Fund - Tranche 1
      • Bridges Renewal Program
      • Safer Local Roads Infrastructure Program
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 2
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 3
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 4
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
    • 2024-25 MYEFO
    • 2026-27 Budget announcements
    • Budget 2024-25 announcements
    • Infrastructure Investment Program Strategic Review
    • Road safety
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2026 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
Allowed types: txt pdf jpg doc docx ppt pptx xls and xlsx.
The accumulated size of all files in this form cannot exceed 10 MB.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Mt Stuart-Bedford Weir Road, (rural road - 121468-22QLD-RTR
Sections of the sealed road are showing signs of advanced deterioration due to aging pavement, traffic volumes and environmental conditions.Insitu stabilisation of identified failures followed by a two coat bitumen seal and linemarking.
Prairie Road (Rural Road) - 121471-22QLD-RTR
In the wet weather the floodway is impassable.Construction of a new concrete floodway approximately 40m long x 6m wide will improve the flood resilience and safer access for motorists.Total cost of proposed project is $80,000
Coddrington Lane (Rural Road) - 121470-22NSW-RTR
Pavment is beyond its servicable life and is showing significant signs of distress and failure with - deep rutting evident for 70% of the Road - cracking in the seal for 25% of the Road; and - shoving along the outside wheel path for 5% of the Road Roadside drainage needs to be re-established to maintain the integrity of the road pavementRehabilitate full width of road pavement - import new pavement material to create cross fall - stabilise the existing pavement by the addition of cementicious product - reseal pavement. Reshape roadside drainage to ensure adequate depth to drain the pavement and drains flow to existing culverts
Old Muttaburra Road (Rural Road) - 121474-22QLD-RTR
In the wet weather the floodway is impassable.Construction of a new concrete floodway approximately 90m long x 6m wide will improve the flood resilience and safer access for motorists.Total cost of proposed project is $150,000
Old Muttaburra Road (Rural Road) - 121475-22QLD-RTR
In the wet weather the floodway is impassable.Construction of a new concrete floodway approximately 130m long x 6m wide will improve the flood resilience and safer access for motorists.Total cost of proposed project is $236,260
Mundoolun Road, Jimboomba - 118563-21QLD-RTR
Mundoolun Road currently features a sub-standard carriageway width and pavement condition which does not meet the desired rural arterial road standards.The project involves the reconstruction and widening of the pavement and other miscellaneous supporting works.Total cost of proposed project is $18,600,000
Croudace Rd, Elermore Vale - 121473-22NSW-RTR
Increasing maintenance from pavement failures.Heavy patching of existing pavements and resurfacing with deep lift ashphalt.Total cost of proposed project is $423,633
Kinta Dr, Beresfield - 121472-22NSW-RTR
Deteriorated road pavement in industrial sub division.Insitu stabilisation of existing road pavement to increase strength and durability. Resurfacing.
Meadowview Road (rural road) - 121469-22NSW-RTR
Three sealed causeways have failed and have created a road safety hazard due to the seal failures and potholes in the pavement.The causeways will be reconstructed, stabalised and sealed.Total cost of proposed project is $121,448
Torver Valley Road (Rural Road) - 121476-22QLD-RTR
In the wet weather the floodway is impassable.Construction of a new floodway approximately 40m long x 6m wide will improve the flood resilience and safer access for motorists.Total cost of proposed project is $60,000

Pagination

  • « First
  • ‹ Previous
  • 1916
  • 1917
  • 1918
  • 1919
  • 1920
  • 1921
  • 1922
  • 1923
  • 1924
  • Next ›
  • Last »

There are no matches for your search