Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Major Projects Business Case Fund
      • Remote Roads Upgrade Pilot Program
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Australian Capital Territory Active Transport Fund Projects
        • New South Wales Active Transport Fund Projects
        • Northern Territory Active Transport Fund Projects
        • Queensland Active Transport Fund Projects
        • South Australia Active Transport Fund Projects
        • Tasmania Active Transport Fund Projects
        • Victoria Active Transport Fund Projects
        • Western Australia Active Transport Fund Projects
      • Bridges Renewal Program
      • Safer Local Roads and Infrastructure Program
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 2
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 3
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 4
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
    • 2024-25 MYEFO
    • 2026-27 Budget announcements
    • Budget 2024-25 announcements
    • Infrastructure Investment Program Strategic Review
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads and Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2026 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
Allowed types: txt pdf jpg doc docx ppt pptx xls and xlsx.
The accumulated size of all files in this form cannot exceed 10 MB.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Nightwell Road (Rural Road) - 094108-17WA-RTR
This section of road has very thin gravel with large potholes. Due to the heavy use during harvest this section of road requires ongoing maintenance to maintain a safe running surface.Removal of overburden and clearing of drains is required with reformation and compaction of base course and 200mm of gravel sheeting for the 4km.
Gillies Road - Sulky - 094114-17VIC-RTR
Collector Road failed in large sections because of the increased traffic in the areaThe road will be reconstructed, with deeper pavement and improved drainage.Total cost of proposed project is $375,000
Princess Street, Merredin - 094115-17WA-RTR
Surface correction - original spray seal is aged and oxidised and requires constant maintenance and pothole repairsRepair spray-sealed surface and reseal with asphalt
Stephens Street, Merredin - 094116-17WA-RTR
Surface correction - original spray seal is aged and oxidised and requires constant maintenance and pothole repairs. The Intersection of Hay Street and Stephens Street requires lifting to affect positive drainage.Repair spray-sealed surface, raise the profile of the Hay Street and Stephens Street intersection and reseal Stephens Street with asphalt.
Sinclair Avenue, Moonah - 094118-17TAS-RTR
Sinclair Avenue is a local urban road, serving adjacent residential properties. The road and associated infrastructure was constructed in 1964 and is at the end of its useful service life. New road surface is required and kerb and channel and footpaths need to be replaced.New sealed surfacing. Replace footpaths, kerb & channel and driveways in the area of works.Total cost of proposed project is $201,838
Moorina Crescent, Berriedale - 094119-17TAS-RTR
Moorina Crescent is a local urban road, serving adjacent residential properties. the road and associated infrastructure was constructed in 1957 and is at the end of its useful service life. The road pavement is in need of reconstruction. New road surface is required and kerb and channel and footpaths need to be replaced.Excavation and replacement of road pavement and new sealed surfacing. Replace footpaths, kerb & channel and driveways in the area of works.Total cost of proposed project is $484,883
Maple Avenue, Moonah - 094120-17TAS-RTR
Maple Avenue is a local urban road, serving adjacent residential properties. The road and associated infrastructure was constructed in 1958 and is at the end of its useful service life. Road widening is required to provide enough space for on street parking. The road pavement is in need of reconstruction. New road surface is required and kerb and channel and footpaths need to be replaced.Road widening including excavation and replacement of road pavement and new sealed surfacing. Replace footpaths, kerb & channel and driveways in the area of works.Total cost of proposed project is $520,000
Gillies Road - Ascot - 094121-17VIC-RTR
Collector Road failed in large sections because of increased traffic in the area.The road will be reconstructed, with deeper pavement and improved drainageTotal cost of proposed project is $375,000
Lakeside Drive, Mallacoota - 094122-17VIC-RTR
Failing seal - Seal is aged, oxidising and crackingRehabilitation, Asphalt regulation, edge repairs and crack sealing will be undertaken as preparation works prior to the commencement of sealing work reinstatement of line marking.
Bastion Point Road, Mallacoota - 094123-17VIC-RTR
Failing Seal - Seal is aged, oxidising and crackingRehabilitation, Asphalt regulation, edge repairs and crack sealing will be undertaken as preparation works prior to the commencement of sealing work reinstatement of line marking.

Pagination

  • « First
  • ‹ Previous
  • 922
  • 923
  • 924
  • 925
  • 926
  • 927
  • 928
  • 929
  • 930
  • Next ›
  • Last »

There are no matches for your search