Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Major Projects Business Case Fund
      • Remote Roads Upgrade Pilot Program
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Australian Capital Territory Active Transport Fund Projects
        • New South Wales Active Transport Fund Projects
        • Northern Territory Active Transport Fund Projects
        • Queensland Active Transport Fund Projects
        • South Australia Active Transport Fund Projects
        • Tasmania Active Transport Fund Projects
        • Victoria Active Transport Fund Projects
        • Western Australia Active Transport Fund Projects
      • Bridges Renewal Program
      • Safer Local Roads and Infrastructure Program
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 2
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 3
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 4
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
    • 2024-25 MYEFO
    • 2026-27 Budget announcements
    • Budget 2024-25 announcements
    • Infrastructure Investment Program Strategic Review
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads and Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2026 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
Allowed types: txt pdf jpg doc docx ppt pptx xls and xlsx.
The accumulated size of all files in this form cannot exceed 10 MB.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Robinson Road, Morley - 052198-14WA-RTR
Current road is in excess of 25 years old with surface deterioration due to aged and loss of stone. Potholes in certain sections. Identified as part of Council's road asset management program as a priority 1 classification.Resealing of road 854m long and 7.2m wide with 25mm asphalt kerb to kerb. A = 6148.8 m2
Chilimony Road - Rural Road - 052199-14WA-RTR
Failure in road pavement (bitumen)Reconstruct failed pavement section by cement stabilising , install additional and improved drainage then bitumen seal over individual areasTotal cost of proposed project is $94,815
Chilimony Road - Rural Road - 052200-14WA-RTR
Sections of road only have a 3.5 metre narrow bitumen seal making it unsafe for trucks and general vehicles to pass. Road is a 27.5 metre road train routeReconstruct sections and bitumen seal to a width of 7 metres using 14mm aggregate with a shoulder gravel width of 1.2 metres. A second coat bitumen seal to be applied in 2015/16
Chilimony Road - Rural Road - 052202-14WA-RTR
Road seal is only 3.5 metres in width at these sections and is unsafe for passing of trucks and vehicles, road is a 27.5 metre road train routeReconstruct each section to a bitumen sealed width of 7 metres, apply one coat of bitumen using 14mm aggregate, and construct gravel shoulders on each side of bitumen to 1.2 metres wide aggregate. A second coat seal to be applied in 2017/2018Total cost of proposed project is $420,987
Koorda-Bullfinch Road -Locality Barbalin (Rural Road) - 052204-14WA-RTR
Rare and endangered Arid Bronze Azure Butterfy colony in old road alignment vicinity Department of Regulation and Department of Parks and Wildlife stopped work for last 6 years and new road alignment away from A class Reserve where butterfly colony found. Problem being fixed is poor intersection sight lines and narrow sealed pavement section, State Blackspot project previous road accidents historyFull construction of New Road alignment 2.7 kilometre road section, Construct a new 4 way intersection @ straight line kilometre 6.04.Installation of two culverts. Measured from start point straight line kilomtre 0.00 Shadbolt Street MukinbudinTotal cost of proposed project is $957,962
Broadwater Road - Rural Road - 052205-14NSW-RTR
The current condition of the road exhibits surface and road shoulder defects and is structurally inadequate for current and predicted traffic volumesWorks will include a pavement overlay and widening to a 7m bitumen seal on a 7.6m road formationTotal cost of proposed project is $330,000
Dalley Street, East Lismore - 052209-14NSW-RTR
The current road exhibits surface failure defectsThe works will include pavement re-construction to improve the structural integrity and ride characteristics of the road
Hunter Street, Lismore - 052211-14NSW-RTR
The road exhibits surface defects and is structurally inadequate for current and predicted traffic volumesWorks will include the reconstruction and widening of the existing road pavement and formalisation of on-street parkingTotal cost of proposed project is $343,816
Pfeiffer Road Woodside - 052215-14SA-RTR
Failed Road Pavement and poor Road geometryReconstruct the 0.970km section of road that has been identified. Improve the road geometry, width and surface drainage, including line marking,guide posts and signage.Total cost of proposed project is $269,000
Yardea Road (Rural Road) - 052216-14SA-RTR
There is lack of good rubble on the running surface. Trees are encroaching on the road width. The surface is very rough and potholed. Side drains are not functioning properly.Trees will be trimmed. Clean and create drains. Sheet with introduced crushed limestone rubble and pull stones into road from shoulders. Water crushed rubble and compact, reforming surface during construction.Total cost of proposed project is $138,127

Pagination

  • « First
  • ‹ Previous
  • 1378
  • 1379
  • 1380
  • 1381
  • 1382
  • 1383
  • 1384
  • 1385
  • 1386
  • Next ›
  • Last »

There are no matches for your search