Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Roads of Strategic Importance
      • Major Projects Business Case Fund
      • Remote Roads Upgrade Pilot Program
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Australian Capital Territory Active Transport Fund Projects
        • New South Wales Active Transport Fund Projects
        • Northern Territory Active Transport Fund Projects
        • Queensland Active Transport Fund Projects
        • South Australia Active Transport Fund Projects
        • Tasmania Active Transport Fund Projects
        • Victoria Active Transport Fund Projects
        • Western Australia Active Transport Fund Projects
      • Bridges Renewal Program
      • Safer Local Roads and Infrastructure Program
        • Safer Local Roads and Infrastructure Program: NSW Successful Projects
        • Safer Local Roads and Infrastructure Program: NT Successful Projects
        • Safer Local Roads and Infrastructure Program: Queensland Successful Projects
        • Safer Local Roads and Infrastructure Program: SA Successful Projects
        • Safer Local Roads and Infrastructure Program: Tasmania Successful Projects
        • Safer Local Roads and Infrastructure Program: Victoria Successful Projects
        • Safer Local Roads and Infrastructure Program: WA Successful Projects
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 2
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
        • Table: Funded projects – Safer Local Roads and Infrastructure Program (SLRIP)
    • Budget Announcements
      • Infrastructure Investment Program Strategic Review
    • 2024-25 MYEFO
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads and Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • IMS (Opens in a new tab/window)
  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2022 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
10 MB limit.
Allowed types: txt, pdf, jpg, doc, docx, ppt, pptx, xls, and, xlsx.
10 MB limit per form.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Karabine Road, York - 062084-15WA-RTR
Clay areas and minimal gravel on pavement area, Drainage and intersection upgrade.Widen intersection, upgrade drainage and gravel sheeting.
Lake Road (Rural Road) - 062085-15VIC-RTR
Pavement and seal deterioration has led to potholes and surface deformationMajor patching and pavement stabilistaion
Dome Road, Dorrigo - 062086-15NSW-RTR
Existing pavement surface is uneven with minor deformations and edge failures. The wearing surface is showing sighns of oxidisation coming to the end of useful life.Minor surface corrections and heavy patching to existing pavement and shoulders. Application of new bitumen seal wearing surface. Reseal reduced in length due to other pavement defect.
Coramba Road Megan - 062087-15NSW-RTR
Existing pavement surface is uneven with minor deformations and edge failures. the wearing surface is showing signs of oxidisation coming to the end of useful life.Surface corrections and heavy patching to existing pavement and shoulders. Application of new bitumen seal wearing surface. Seal design was improved to achieve an improved wearing surface finish as temperature in pavement was unable to reach optimum seal temperature requiring an alternative emulsion and stone treatment.
Hydes Creek Road Valery - 062088-15NSW-RTR
Existing pavement surface is uneven with minor deformations and edge failures. The wearing surface is showing signs of oxidisation coming to the end of useful life.Surface corrections and heavy patching to existing pavement and shoulders. Application of new bitumen seal wearing surface. Application of asphalt overlay and road widening due to temperatures in area.
Kalang Road Kalang - 062089-15NSW-RTR
Existing pavement surface is uneven with minor deformations and edge failures. The wearing surface is showing signs of oxidisation coming to the end of useful life.Surface corrections and heavy patching to existing pavement and shoulders. Application of new bitumen seal wearing surface. Reduction in length due to revised assessment of pavement, resulting in more defects which was then unsuitable for reseal and will require rehabilitation.
Tyringham Road Dorrigo - 062090-15NSW-RTR
Existing surface is uneven with minor deformations and edge failures. The wearing surface is shoowing signs of oxidisation coming to the end of useful life.Surface corrections and heavy patching to existing pavement and shoulders. Application of new bitumen seal wearing surface.
Cedarvale Road, Boyne Valley - - 062091-15QLD-RTR
The floodway has reached its design life and is beginning to show signs of failure. Substantial structural issues have been identified which poses a risk to the floodway being washed away in a storm event, resulting in the isolation of communities.Reconstruct the concrete causeway and approaches.Total cost of proposed project is $733,800
The Point Road, Woolwich, NSW 2110 - 062092-15NSW-RTR
Oxidisation of the asphalt on the surface layer due to the ageing process. Crocodile cracks and pot holes occurring on the road surface. Damages on the Kerb & Gutter sections due to ageing process.Mill and re-sheet the surface layer of the road paving with 30mm thick asphaltic concrete (AC10) layer. Reconstruct the damaged kerb & gutter sections.Total cost of proposed project is $117,717
Pike Rd Rural Road - 062093-15WA-RTR
Existing seal has major cracking past trafficable used by date.Reseal with 10mm aggregate

Pagination

  • « First
  • ‹ Previous
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • Next ›
  • Last »

There are no matches for your search