Applicant Organisation | Project Name | Project Description | Australian Government Funding Amount (#) | Total Project Costs ($) |
---|---|---|---|---|
Warrnambool City Council | Warrnambool City Council - Industrial Precinct Footpath Construction | Construction of approximately 1700m of standard footpath within the Warrnambool Industrial Precinct, linking residential areas, public open space and public transport to the commercial area. | $266,626.00 | $533,252.00 |
City of Darebin | City of Darebin - BT Connor Reserve Shared Path | The project will construct a two-way shared path along the southern edge of BT Connor Reserve. It will measure approximately 280 metres in length and connect the Merri Creek Trail with a Darebin Streets for People Corridor and Victorian Government Strategic Cycling Corridor. | $158,000.00 | $316,000.00 |
Moorabool Shire Council | Moorabool Shire Council - Griffith Street, Maddingley Active Transport Corridor | Construction of an off-road Active Transport Corridor along Griffith Street, Maddingley connecting new residential growth areas to Retail, Schools, Recreation Facilities and Train Station. | $1,814,503.00 | $3,629,007.00 |
Moorabool Shire Council | Moorabool Shire Council - Gordon Township Active Transport Loop | Construction of an active transport route in Gordon to create new shared user paths connecting key recreation nodes and separating pedestrians and cyclists from traffic. | $678,825.00 | $1,357,650.00 |
Hobsons Bay City Council | Hobsons Bay City Council - Kororoit Creek Shared Trail Stages 4 and 5 | The project will construct a 2.7km section of new shared trail, connecting Stages 1, 2 and 3 to the new Stages 4 and 5. | $5,000,000.00 | $15,482,221.00 |
Maroondah City Council | Maroondah City Council - Design and construction of Greenwood Avenue Shared Use Path | This project will upgrade approximately 1.1 km of footpath to a shared use path (SUP) along the full length of Greenwood Avenue, Ringwood. The off-road SUP provides a strategic active transport link for all abilities between the railway station in central Ringwood and the regional Jubilee Sports Precinct, and the Aquinas College and Great Ryrie Primary School. A Draft Detailed Design has been completed. Prior to construction, IFC Design and Lighting Design is required. | $681,630.00 | $1,363,260.00 |
Ararat Rural City Council | Ararat Rural City Council - Design and Upgrade of the Active Transport Bicycle Network, Ararat | The project and design and upgrade approximately 9.85 kms of key bicycle routes identified in the Ararat on the Move - Active Transport and Lifestyle Strategy. The network will connect local residents and visitors to key places of employment, schools, community organisations, recreational facilities, Ararat CBD and train station. | $266,000.00 | $399,000.00 |
Frankston City Council | Frankston City Council - Construction of Shared User Path (SUP) on Towerhill Road, Frankston South | Approximately 1km of standard footpath will be upgraded to Shared User Path (SUP) standard. Construction of traffic calming treatments, including raised crossings. | $923,650.00 | $1,847,300.00 |
Yarra Ranges Shire Council | Yarra Ranges Council - Design and construction of the Liverpool Road Trail, Kilsyth | This project will create a new 1.7 km long shared user path (S.U.P.) along Liverpool Road, between Canterbury Road and Mount Dandenong Road, Kilsyth. It will feed into nearby trails, and connect key destinations such as the Baywater Business Precinct and Pinks Reserve which is a regional Basketball and Netball facility. The trail will also include raised crossings at high risk conflict points to improve safety for future trail users. | $463,938.00 | $927,876.00 |
Hume City Council | Hume City Council - Highland Drive Shared User Path Upgrade | The project will involve the upgrade of approximately 160m of footpath to a shared path on Highlander Drive between Estuary Place and Andaman Drive. This fills a missing link between SUP network on both ends of the proposed link. | $50,000.00 | $100,000.00 |
Hume City Council | Hume City Council - Lygon Drive Shared User Path and Cycling Facilities Upgrades | Upgrade approximately 475m of footpath to SUP on Lygon Drive between Craigieburn Road and Central Park Avenue and provide other cycling improvements | $200,000.00 | $400,000.00 |
City of Port Phillip | City of Port Phillip - Beacon Road Active Transport Safety Upgrade, Port Melbourne | This project includes the development of a detailed design and delivery of a safe bike riding corridor along Beacon Road between Howe Parade and Williamstown Road, connecting a new pedestrian-operated signal on Williamstown Rd (to be delivered by DTP) and the Garden City Bike Corridor. | $515,000.00 | $1,030,000.00 |
City of Glen Eira | City of Glen Eira - Improving Paths, Connecting Communities | Improving key cycling corridors to better connect major activity centres in Glen Eira | $2,336,000.00 | $4,836,000.00 |
Mount Alexander Shire Council | Mount Alexander Shire Council - Design and construction of McKenzie Hill to Parker Street Shared Pathway, Castlemaine | This project will design and construct a 3.6km shared cycling and pedestrian pathway linking McKenzie Hill to Parker Street via the Castlemaine Railway Station. This route is used by children and families travelling to and from schools and childcare centres, and by commuters travelling to the train station and Castlemaine town centre. | $3,010,600.00 | $3,763,200.00 |
Melton City Council | Melton City Council - Design and construction of a shared use path along Westwood Drive, Burnside/Ravenhall. | The project will construct approximately 3km of shared path which includes 2km widening of existing footpath and 1km of new shared path along Westwood Drive. This will deliver a shared path in the industrial estate south of Ballarat Road that currently has no paths on either side of the road, and widens the existing footpath from Ballarat Road to Rockbank Middle Road Burnside that currently doesn’t have any cyclist infrastructure and very high traffic volumes on the road. The project will provide a shared path that connects the industrial employment precinct, shopping centres, schools and community facilities along this road corridor. | $969,527.00 | $1,939,054.00 |
Melton City Council | Melton City Council - Design and Construction of Raised Priority Crossings - Caroline Springs Boulevard and Gourlay Road Corridor, Caroline Springs. | This project will deliver 21 new raised shared use path crossings, two new at-grade shared use path crossings and modification of nine existing pedestrian crossings on both sides of the 8.5 km Caroline Springs Boulevard and Gourlay Road corridor. This will provide a premium, consistent active transport corridor for users of the Caroline Springs train station, Caroline Springs Library, the Caroline Springs retail precinct, and 15 schools, sports precincts, retail outlets, employment hubs and community facilities. | $1,147,093.00 | $2,294,187.00 |
Melbourne City Council (City of Melbourne) | Melbourne City Council (City of Melbourne) - Rathdowne Street Traffic Signals Upgrade | Design and construction of 3 traffic signals upgrades on Rathdowne Street, Carlton | $963,095.00 | $1,926,190.00 |
Bass Coast Shire Council | Bass Coast Shire Council - Design and construction of the Ventnor Road Shared Path, Phillip Island. | A 2 kilometre long, 2.5 wide concrete shared path that will link into 2.5 kilometres of existing shared path to form a 4.5 kilometre shared path linking the townships of Cowes and Ventnor | $980,000.00 | $1,960,000.00 |
Horsham Rural City Council | Horsham Central Activity District - safe eastern access for cyclists and pedestrians | Implement safety upgrades to two key entry roads into the Horsham Central Activity District | $900,000.00 | $2,248,000.00 |