State | Proponent | Project Name | Project Summary | Australian Government Funding ($) | Total Project Cost ($) |
---|---|---|---|---|---|
NSW | Moree Plains Shire Council | Moree Plains Shire Council - Design and Construct Terry Hie Hie Road Upgrade, Terry Hie Hie | The project is for the design and construction of the upgrade to the Terry Hie Hie Road at Terry Hie Hie. The project will upgrade and bitumen seal 4.9km of Terry Hie Hie Road (SR101) North from the Gwydir/Moree Plains Shire boundary. The works will provide an 8m wide sealed surface, improved pavement and drainage improvements to address nuisance flooding. | $5,000,000 | $6,250,000 |
NSW | Bogan Shire Council | Bogan Shire Council - Remove and replace the existing informal low-level crossing with Box Culvert at Monkey Bridge Bypass at Bogan River, Coolabah | The project is for the construction of a formal bypass at Monkey Bridge on the Bogan River in Coolabah, replacing the 40 year old existing informal and illegally maintained crossing. The new bypass will utilise box culverts to facilitate proper water flow and fish passage. The structure will span 14.4 metres with 6m width and 10-metre sealed approaches on both sides. | $412,000 | $515,000 |
NSW | Wentworth Shire Council | Wentworth Shire Council - Design and upgrade of Milpara Road, Anabranch South. | The project is for the design and upgrade of Milpara Road, Anabranch South. The project will include formation widening to achieve minimum 6m width, guard rail extension, upgrade of unsealed road to sealed pavement including two intersection upgrades. Additionally, it will include a dual-bound hardstand area for decoupling/turn-around point for heavy vehicles, embankment protection for the extent of the waterway, sight distance improvements as well as traffic control devices/other road furniture. | $559,417 | $765,721 |
NSW | Goulburn Mulwaree Council | Goulburn Mulwaree Council - Glynmar Road Causeway Design and Upgrade Project | The project will replace a failing causeway across Stony Creek which is rapidly approaching the end of its asset life.
| $1,219,092 | $1,523,865 |
NSW | Gwydir Shire Council | Gwydir Shire Council - The Design and Construction to upgrade Buckie Road, Croppa Creek. | The project is an upgrade to a 10.03km section of the Buckie road - from an unsealed to sealed state - at Croppa Creek within the Gwydir Shire, up to the border of Moree Plains Shire Council. Upgrade works include road sealing, flood immunity, strengthening and widening, pavement rehabilitation and road alignments. Existing pavement will be re-shaped to a 9m formation and stabilised to a depth of 400mm, a 200mm base layer of DGB20 road base will be laid under an 8m wide two-coat bitumen. | $5,000,000 | $6,855,000 |
NSW | Lismore City Council | Lismore City Council -Chelmsford Bridge, Chelmsford Road - Bridge Renewal | The project will replace the current Chelmsford Bridge structure with a single span, single lane, concrete and steel structure. The length of the new bridge will be 20m and the finished surface level of the deck will be raised approximately 2.0m in height from the existing bridge deck. The new bridge will have a design life of 100 years. | $1,676,000 | $2,095,000 |
NSW | Waverley Council | Waverley Council - Construction of Continuous Footpath Treatments on Mitchell Street, Bondi Beach | The project involves constructing two continuous footpath treatments along Mitchell Street, at the Hastings Parade and Ramsgate Avenue intersections. The works will include kerb buildouts with garden beds and street trees to compliment the new continuous footpath treatments. | $121,750 | $243,500 |
NSW | Lismore City Council | Lismore City Council - The Channon Road, Dunoon - Upgrade | The project will upgrade Channon Road from Currie Road to Dunoon Road. Approximately 1.9km of road will be upgraded to at least 7m width formation with sealed shoulders. Camber and superelevation issues to be improved along the road. Drainage issues to be factored into the road upgrade together with pavement rehabilitation. | $2,015,708 | $2,519,636 |
NSW | Mid-Coast Council | MidCoast Council - Replacement of Mt. Coxcomb Rd Bridge Number 1, Upper Lansdowne | The project will replace the Mt Coxcomb Road Bridge Number 1 which has reached its end of life. The bridge is a single-span, single-lane timber bridge over Lansdowne River on Mt Coxcomb Road. Flood waters have damaged the timber structural elements of the bridge. The new bridge will be raised above 1/100 flood levels and upgraded to meet current bridge standards. The project involves removal of the existing structure and construction of a single-lane concrete bridge over Lansdowne River. The replacement bridge is proposed for the same location with upgraded length of 15m and width of 5m. | $1,433,225 | $1,791,532 |
NSW | Waverley Council | Waverley Council - Construction of Raised Pedestrian Crossing on Newland Street at Walter Street, Bondi Junction | The project is for the construction of a raised pedestrian crossing on Newland Street at Walter Street, Bondi Junction. The project involves the removal of existing pedestrian refuge islands and replacement with a new raised pedestrian crossing. The works include kerb build-outs with landscaping, raingardens, street trees, upgrades to street lighting and new kerb ramps to compliment the new raised pedestrian crossing. | $96,250 | $192,500 |
NSW | Waverley Council | Waverley Council - Construction of Bourke Street Upgrades, Bondi Junction | The project involves upgrades to Bourke Street from Queens Park Road to Birrell Street, including a new separated uphill one-way bike path northbound, various intersection improvements including new continuous footpath treatment, kerb extensions reducing pedestrian crossing widths, landscaping, street trees, and other upgrades. | $444,299 | $888,598 |
NSW | Maitland City Council | Maitland City Council - Thornton North Road Infrastructure Lane Duplication of Haussman Drive Thornton between Raymond Terrace Road and Taylor Avenue | The project is for lane duplication of approx. 400m of Haussman Drive between Raymond Terrace Road and Taylor Avenue to provide dual carriageways in each direction with central median island shared path shoulder/bicycle lanes and improved adjacent property accesses including dedicated left in out intersection for an approved senior's development. | $3,745,400 | $7,490,800 |
NSW | Goulburn Mulwaree Council | Goulburn Mulwaree Council - Lansdowne Street Heavy Vehicle Route Pavement Rehabilitation Project | The Lansdowne Street Heavy Vehicle Route Pavement Rehabilitation Project will remediate and upgrade a 530m section of road where significant pavement failure has occurred. The structural improvements delivered by this project include:
| $1,909,687 | $2,387,109 |
NSW | Council of the City of Shellharbour | Council of the City of Shellharbour - Yellow Rock Road Safety Upgrades, Tullimbar | The project involves the construction and upgrade of more than 600m of Yellow Rock Road in Tulimbar. The project includes widening the road, installing new kerbing and guttering, re-grading the surface, adding car parking spaces, and upgrading intersections and access points. Also, it includes the construction of a pedestrian refuge and shared path, improvements to lighting and stormwater infrastructure, and the installation of new signage and line markings. | $5,000,000 | $10,905,370 |