Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Major Projects Business Case Fund
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Successful Projects under the Active Transport Fund - Tranche 1
      • Bridges Renewal Program
      • Safer Local Roads Infrastructure Program
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 2
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 3
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 4
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
    • 2024-25 MYEFO
    • 2026-27 Budget announcements
    • Budget 2024-25 announcements
    • Infrastructure Investment Program Strategic Review
    • Road safety
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2026 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
Allowed types: txt pdf jpg doc docx ppt pptx xls and xlsx.
The accumulated size of all files in this form cannot exceed 10 MB.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Ogilvie East Road, (rural road) - 113824-20WA-RTR
Section of road bitumen seal has come to its time for renewal to preserve the road assetApply a hot bitumen emulsion seal with 10mm aggregate
Northampton-Nabawa Road, (rural road) - 113827-20WA-RTR
Section of road requires reseal to preserve the road assetReseal using hot bitumen emulsion with 10mm aggregateTotal cost of proposed project is $182,000
Wandin East Road, Wandin North. - 113863-20VIC-RTR
The existing road is sealed but has minimal lane width for two way traffic. The road carries a high volume of heavy vehicles.Road rehabilitation works and pavement widening from 5.4m to 6m width. Upgrade and widening of the road will improve the safety for road users.Total cost of proposed project is $591,446
West Plains Road (Rural Road) - 113874-20NSW-RTR
The existing gravel surface has significant numbers of heavy vehicles and frequently becomes eroded and rutted, requiring a heavier pavement and two coat bitumen seal.Reuse and lime stabilisation of the existing gravel surface to form a subbase layer. A new 200mm thick manufactured HD gravel base will be constructed. A two coat 20/10 double/double bitumen seal will then be applied.Total cost of proposed project is $1,955,356
Howick Street, South Launceston - 113866-20TAS-RTR
Failing road surface and pavement requires rehabilitation.The surface assets associated with Howick Street between Wellington Street and High Street requires rehabilitation. The scope of works also includes the renewal of the surface between the Charles Street and Howick Street intersection and the end of existing seal south of the pedestrian crossing. The roundabout also requires renewal. A large dig out of the pavement is required on the northern side of Howick Street, with the addition of 30x1.5m + 50m+ of subsoil drains to prevent water water intrusion and line marking.Total cost of proposed project is $796,000
William Street, Launceston - 113867-20TAS-RTR
Failing road surface and pavement requires rehabilitation.William Street between St John Street and George Street has failed and requires a full pavement rebuild. A full surface reseal is required for the entire road section between St John Street and Tamar Street.Total cost of proposed project is $1,041,278
Durbar Avenue, Kirrawee - 113877-20NSW-RTR
Significant pavement failure. Existing wearing course severely oxidised, potholing in patches. Road pavement require renewal of base and wearing surface. The section of road requires kerb and guttering and upgrade of footpath.Road pavement reconstruction works for a length of 420m (entire road) and a width of approximately 9.0m. Works include mill and fill of 130mm of deeplift asphalt concrete base layer and 50mm of wearing course. Works also include completion of kerb and gutter missing link and provision of a new footpath.
Elouera Road, Cronulla - 113876-20NSW-RTR
The section of Elouera Road between Hume Road and Link Road was reconstructed as part of 2020/2021 work program. It is proposed to continue the works between Links and Captain cook Drive. The northbound lane in need of upgrade and require pavement widening, kerb and gutter and stormwater drainage upgrade. Road pavement has exceeded its service life. surface course is in poor condition and water is infiltrating the base course due to inadequate drainage system.Road pavement reconstruction over approximately 3,460sqm. Road pavement works include 130mm thick asphalt concrete base layer and 50mm thick asphalt wearing surface. Works also include provision of kerb and gutter and stormwater drainage upgrade.Total cost of proposed project is $1,698,491
Iowna Meeline Access Rd, (Rural Road) Mount Magnet - 113875-20WA-RTR
Depressed formation which results in section of road becoming and remaining impassable following wet weather events.Construct formation to existing terrain level and install gravel sheeting.
Prentice Lane, Strathfield - 113834-20NSW-RTR
Crocodile cracks, longitudinal cracks, rutting and some edge failuresmill and fill with AC 10 upto 50mm in depth also some heavy patching works when the road need repairsTotal cost of proposed project is $17,864

Pagination

  • « First
  • ‹ Previous
  • 1428
  • 1429
  • 1430
  • 1431
  • 1432
  • 1433
  • 1434
  • 1435
  • 1436
  • Next ›
  • Last »

There are no matches for your search