• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jun 2021 - Sep 2021
  • Estimated project cost $1,955,356
  • Australian Government contribution $598,856
  • Local Council/Shire Forbes Shire Council
  • State NSW

Project description

The existing gravel surface has significant numbers of heavy vehicles and frequently becomes eroded and rutted, requiring a heavier pavement and two coat bitumen seal.

Reuse and lime stabilisation of the existing gravel surface to form a subbase layer. A new 200mm thick manufactured HD gravel base will be constructed. A two coat 20/10 double/double bitumen seal will then be applied.

Total cost of proposed project is $1,955,356

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.