Project description

The pavement has potholes and shoving. This is due to the high traffic volume at the intersection. There is also a problem with a significant drop in level with lateral and longitudinal cracking as a result of failure of the subgrade material. This has left the road surface uneven and prone to further damage.

A polymer modified bitumen layer will be applied over the potholed area followed by a layer of asphalt. This should improve flexibility in the pavement while increasing the depth and strength. There will also be repairs involving removing the failed surface, compacting the sub base, placing high quality base material, grading and compacting, followed by a thick layer of asphalt.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.