- Funding program Roads to Recovery Program
- Status Completed
- Transport mode Road
- Expected start/finish Jun 2013 - Sep 2013
- Estimated project cost $283,770
- Australian Government contribution $283,770
- Local Council/Shire Central Darling Shire Council
- State NSW
Project description
Existing timber bridge is structurally unsound due to age and deterioration of timber elements. All critical structural components require replacement including piles, abutments and decking.It is proposed to replace the existing timber bridge with a suitable concrete or steel bridge procured with a design and construct tender. Single lane bridge length 20 meters width 5 meters
Project last updated:
Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.