- Funding program Roads to Recovery Program
- Status Completed
- Transport mode Road
- Expected start/finish Mar 2013 - Apr 2014
- Estimated project cost $83,700
- Australian Government contribution $24,299
- Local Council/Shire Byron Shire Council
- State NSW
Project description
A level 2 bridge inspection was completed in February 2011 and determined that there were a number of the structural elements of the timber bridge in a poor condition. It was recommended that repair of these structural timber elements be carried out due to their poor condition, loss of structural integrity and strength and to avoid the risk of catastrophic collapse.Carry out temporary repair of the approach road pavement and replace piles and headstocks to make bridge accessibles and safe, with a load limit of 10 tonne, until major works can be undertaken.
Total cost of proposed project is $83,700
Project last updated:
Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.