Project description

The road was originally constructed in 1979 and is showing signs of deterioration with numerous potholes and extensive failures due to the increasing traffic volume over the years

It is proposed to carry out heavy patching of failed areas and asphalt surfacing for a length of 1,130 metres and a width of 6.6 metres

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.