• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2014 - Apr 2014
  • Estimated project cost $144,731
  • Australian Government contribution $112,905
  • Local Council/Shire Shire of Murray
  • State WA

Project description

The wearing surface has deterioated badly, it is cracked and the edges are broken. The road is potholed and has various low spots where water ponds, therefore requiring minor reconstruction and possible regrading to improve drivability and drainage.

Reconstruct, regrade and asphalt overlay the full length. The works will involve reprofiling of pavement surface, widening the edges and installing kerbing and drainage structures as required.

Total cost of proposed project is $144,731

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.