- Funding program Roads to Recovery Program
- Status Completed
- Transport mode Road
- Expected start/finish Sep 2013 - Sep 2013
- Estimated project cost $41,218
- Australian Government contribution $41,218
- Local Council/Shire Shire of Murray
- State WA
Project description
This gravel section of road is used in summer for crabbing and camping and frequently requires regrading and topping up of gravel. Rehabilitating this section of road will reduce maintenance, prolong the life of the pavement and greatly improve drivability.This 1.1 kilometre section will be rehabilitated with an emulsion base bind product mixed with gravel to a width of 7.0 metres and the existing road swales regraded where required.
Project last updated:
Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.