• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2013 - Dec 2013
  • Estimated project cost $23,713
  • Australian Government contribution $23,000
  • Local Council/Shire Wollondilly Shire Council
  • State NSW

Project description

Existing road is unsealed, rough, has poor drainage and high maintenance costs.

The proposal is to construct the road for its first 100 metres and with a width of 5.5 metres, the whole length of the public road. The work includes table drains, widening and strengthening the road, together with a sealed surface. The adjoining owners may extend this work at their cost along their shared right of carriageway (private road) that connects to the end of this public road.

Total cost of proposed project is $23,713

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.