• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2014 - Jun 2014
  • Estimated project cost $632,801
  • Australian Government contribution $254,214
  • Local Council/Shire Wollondilly Shire Council
  • State NSW

Project description

Existing road is rough with areas of the road base failing. It also has below grade kerb gutter and drainage (with grassed bank) within part of the road reserve for part of its length.

The works will include widening and strengthening the road for a length of 600 metres and a width of 11 metres and also drainage works to bring the kerb and gutter and stormwater pit up to the road grade.

Total cost of proposed project is $632,801

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.