• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2013 - Feb 2014
  • Estimated project cost $114,618
  • Australian Government contribution $114,236
  • Local Council/Shire Southern Downs Regional Council
  • State QLD

Project description

The timber culverts have deteriorated and are at risk of collapsing.

Replacing timber culverts with four cell (4/ 1200 mm width x 600 mm height) crown units at each location, gravel pavement on top & approaches and two coats of bitumen sealing. Replacing the old timber culvert with new concrete culverts would be the suitable option rather than repairing the timber culvert as it passed its design life and the culvert is deteriorated.

Total cost of proposed project is $114,618

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.