• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2015 - Feb 2015
  • Estimated project cost $181,141
  • Australian Government contribution $181,141
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The road surface is affected by numerous cracks and potholes. The existing surface is old, brittle and prone to cracking. It is disintegrating in multiple areas within the road section.

The proposed work will include the replacement of old and deteriorated material with asphalt and resurfacing of the road section with asphalt. Length = 100 m; Width = 12 m; Area = 1200 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.