• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2015 - May 2015
  • Estimated project cost $70,449
  • Australian Government contribution $70,449
  • Local Council/Shire Gilgandra Council
  • State NSW

Project description

Road is mostly constructed from a sandy loam material on black clay, resulting in extensive dust bog holes in the dry periods and in wet periods becomes extremely boggy and slippery.

Chemical Stabilisation Treatment – Rip and shape existing road – Using a road stabilisation machine (Pulvie) and a lime spreader mix the existing material to a depth of 300mm or greater while incorporating the lime. Re-shape and compact finished material to conform with road design.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.