• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2015 - Mar 2015
  • Estimated project cost $69,521
  • Australian Government contribution $68,206
  • Local Council/Shire Shire of Trayning
  • State WA

Project description

Improving road standards for tourism. The current width of the road is at 8 meters with a corrugated surface. To improve conditions of the surface, gravel re-sheeting is necessary. The width of the road surface will be increased to 10 meters wide to allow for vehicles passing each other on their way to and from the Billyacatting Reserve.

A three (3) kilometer gravel re-sheeting program to re-surface poor surface condition and widen narrow carriageway.

Total cost of proposed project is $69,521

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.