• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2014 - Dec 2014
  • Estimated project cost $150,948
  • Australian Government contribution $150,948
  • Local Council/Shire Penrith City Council
  • State NSW

Project description

The road was originally constructed in 1970 and is showing signs of deterioration with numerous potholes and failures.

It is proposed to stabilise the existing pavement to a depth of 250mm and provide a 2 coat seal for a length of 1016 metres and width of 6.5 metres.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.