• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2015 - Jun 2015
  • Estimated project cost $1,150,000
  • Australian Government contribution $500,000
  • Local Council/Shire Narrabri Shire Council
  • State NSW

Project description

There are numerous pavement failure along the outer edge and across the pavement width due to the pavement not being strong enough. This length of road is in an unsafe condition for the use of heavy transport on what is an important freight route from the Baradine/Coonamble/Pilliga areas into Wee Waa and the railway line at Wee Waa

The work consists of heavy patch repair over the failed section of road in both part and full width to provide strength and safety to the road users. This heavy patching consists of the addition of gravel as required and the stabilisation of the existing material. There will also be some resealing of sections of the road where the pavement is sound, but the existing bitumen is oxidised

Total cost of proposed project is $1,150,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.