• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2015 - Jun 2015
  • Estimated project cost $382,280
  • Australian Government contribution $382,280
  • Local Council/Shire Shire of Mundaring
  • State WA

Project description

Road pavement is failing by potholing and rutting due to age of pavement and poor stormwater drainage capture resulting in water intrusion into the road base materials.

Reconstruction of road pavement and installation of additional stormwater drainage network and subsoil drainage alonside the sections of road to be reconstructed. Bus embaymnets in the road section will be resurfaced with brown asphalt reflecting the historical precinct of the Darlington townsite.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.