• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2015 - Oct 2015
  • Estimated project cost $66,526
  • Australian Government contribution $66,526
  • State NT

Project description

The bitumen road section consists of large cracks, loss of surface bitumen, edge failures, potholing and loose pavement surface. Road shoulders are non-existent. Ponding of water near the edge of the road. Driveways and front accesses are non-existent. Causeways have deteriorated. The gravel section has deteriorated to be non-existent.

Design and construct the road to a re-formed sealed road section including kerb and guttering, new formed gravel road section and drainage including kerb and guttering

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.