• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2015 - Mar 2015
  • Estimated project cost $198,092
  • Australian Government contribution $198,092
  • Local Council/Shire City of Belmont
  • State WA

Project description

Asphalt wearing course deformation and cracking. Damaged kerbing along both side of the street and old drainage pits not up to standard blocking easily and reducing storm water capture.

Length, width and area of job: 170m x 9m = 1,530m2. A combination of reconstruction and overlay to be used on two sections of the road after the drainage has been upgraded and the damaged sections of kerb replaced.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.