• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2016 - May 2016
  • Estimated project cost $129,561
  • Australian Government contribution $129,561
  • Local Council/Shire City of Belmont
  • State WA

Project description

The condition of the existing asphalt wearing course is poor with minor deformations and cracking evident.

Length, width and area of the job: 640m x 7.4m = 4,736m2. Kerbing is to be retained with the edge of the asphalt wearing course profiled along both kerb faces. Existing drainage structures raised to new road levels and the full length of the job overlayed.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.