• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2017 - Apr 2017
  • Estimated project cost $87,791
  • Australian Government contribution $87,791
  • Local Council/Shire Upper Hunter Shire Council
  • State NSW

Project description

Thin gravel pavement, poor school bus access and safety during rain events.

Rehabilitate and upgrade the existing road pavement. Provide gravel overlay of 150mm thickness with approved selected natural material for the length of road and shape with minimum crossfall of 6%. Undertake roadside drainage improvements (provision of table drains, tail out drains etc.) as required. Length of road to be upgraded 13-18km and 6 metres wide, total seal area 30,000m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.