• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2016 - Sep 2017
  • Estimated project cost $344,016
  • Australian Government contribution $344,016
  • Local Council/Shire Warrumbungle Shire Council
  • State NSW

Project description

The existing timber 15 metre long bridge structure has reached the end of its useful life and is no longer able to carry heavy loads.

Replace the timber bridge structure with a 10 metre long concrete box culvert structure. The works will include construction of a sidetrack and road approaches to the new bridge structure.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.