• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2016 - Mar 2017
  • Estimated project cost $123,822
  • Australian Government contribution $123,822
  • Local Council/Shire Warrumbungle Shire Council
  • State NSW

Project description

The surface of Box Ridge Road in the proposed work location is unsealed and does not have sufficient road base, which results in potholes and ruts, which reduces the speed at which vehicles may travel along the road. Furthermore, the existing surface becomes slippery during and after rainfall

Overlay the surface of a 10.0km length of Box Ridge Road with 100mm compacted road base material.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.