• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2018 - Jun 2018
  • Estimated project cost $272,780
  • Australian Government contribution $255,060
  • Local Council/Shire Shire of Northampton
  • State WA

Project description

Road surface is bitumen and needs resealing. the bitumen surface is undulating, cracking and pot holes occur frequently due to the age of the bitumen surface. In addition the west side of road requires installation of kerb to channel drainage off road into storm water drainage system. At present west side has a grass verge that prevents water run off into the underground drainage system

Resurface 7m road surface with a slurry seal, install kerb to west side of road and backfill

Total cost of proposed project is $272,780

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.