- Funding program Roads to Recovery Program
- Status Completed
- Transport mode Road
- Expected start/finish Dec 2015 - Apr 2016
- Estimated project cost $580,238
- Australian Government contribution $448,312
- Local Council/Shire Sunshine Coast Regional Council
- State QLD
Project description
The proposed section has the following defects: failures in both wheel paths, deep depressions, crocodile cracking and the asphalt surface is old, brittle and oxidised. Both the surface and pavement have major failures.Pavement rehabilitation consisting in-situ stabilisation of the existing pavement and a new asphalt wearing surface (using 50mm thick size 14mm dense graded asphalt) including the installation of subsoil drainage.
Total cost of proposed project is $580,238
Project last updated:
Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.