• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2015 - May 2016
  • Estimated project cost $682,268
  • Australian Government contribution $451,243
  • Local Council/Shire Gosford City Council
  • State NSW

Project description

As with previous stages the road is too narrow for the increasing volumes of traffic. The pavement is poorly aligned and in need of a complete reconstruction. There is a lack of formal stormater drainage and pedestrian access.

Widen & realign the road over a distance of 430 metres at a width of 8.0 metres kerb to kerb. Provide kerb and gutter, stormwater drainage. Provide footpath on both sides. Install guardrail as required. Construct log and sandstone retaining walls to retain excavated areas. Reconstruct property accesses to flatten the grade.

Total cost of proposed project is $682,268

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.