• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2016 - May 2016
  • Estimated project cost $245,793
  • Australian Government contribution $245,793
  • Local Council/Shire Kentish Council
  • State TAS

Project description

High wear and tear from heavy traffic, a high level of local and tourism traffic on the road wearing surface and edges, narrowness of the road which at present is only 4.2 metres wide, narrow road shoulders which are currently .5 of metre, failures in areas within the road works it has been deemed the road is at an unacceptable level of service, this requires the full length of the wearing surface and shoulders to be replaced and widened.

Remove the existing road surface, and replace and widen 1000 metres of Nowhere Else Road with a new road surface to a new width of 5.5 metres, and widen the road shoulders to 1 metre.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.