• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jun 2016 - Jun 2018
  • Estimated project cost $24,404
  • Australian Government contribution $24,404
  • Local Council/Shire Muswellbrook Shire Council
  • State NSW

Project description

The current drainage has failed leading to overflow causing water affected damage to both Bimbadeen Drive and the New England Highway. This has been caused by a build of silt in the existing unsealed table drains

Concreting the drains and installing silt traps designed to allow the water the better drain away and not overflow onto the road surfaces

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.