• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2016 - Apr 2017
  • Estimated project cost $348,496
  • Australian Government contribution $10,736
  • Local Council/Shire Sunshine Coast Regional Council
  • State QLD

Project description

The proposed section has the following defects: significant crocodile cracking, large depressions, potholes. The existing asphalt surface is old and oxidised. There are moderate failures in both the surface and pavement structure.

Pavement rehabilition consisting of in situ stabilising the existing pavement or a full depth reconstruction of the road pavement. Either treatments has a size 14mm 50mm thick dense graded asphalt surface.

Total cost of proposed project is $348,496

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.