• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2017 - Jun 2017
  • Estimated project cost $705,000
  • Australian Government contribution $398,829
  • Local Council/Shire City of Glen Eira
  • State VIC

Project description

The existing concrete road and kerb and channel have deteriorated over the years, large cracks appearing at many locations showing signs of failures The road is within special building overlay and liable to flooding in a 1%AEP event. There is no sufficient drainage to drain the surface stormwater.

The work involves reconstructing the concrete road with reinforcement, installing new kerb and channel and providing adequate drainage.

Total cost of proposed project is $705,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.