• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2016 - Dec 2017
  • Estimated project cost $1,871,301
  • Australian Government contribution $1,871,301
  • Local Council/Shire Wellington Shire Council
  • State VIC

Project description

Existing Concrete, Steel and timber bridge is in the last stages of its useful life and unsuitable for rehabilitation.

It is proposed to replacement of existing Single lane Concrete/Steel/timber bridge with dual lane bridge incorporating separated pedestrian access. , capable of supporting main roads loading criteria (SM1600). The dimensions of the replacement bridge will be 50m in length and 9.7 m total width

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.