• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2016 - Mar 2017
  • Estimated project cost $40,000
  • Australian Government contribution $40,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road surface has very little gravel and quickly becomes rough after grading.

Form the existing surface to the required crossfalls then import, spread and compact gravel to 100 milimetres thick at the design croassfalls. Form table and cut off drains as required.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.