• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2017 - Dec 2017
  • Estimated project cost $1,800,000
  • Australian Government contribution $1,014,214
  • State QLD

Project description

Existing structure is in Condition state 4 (Very Poor) condition. Based on the traffic volumes and overall condition of the structure the bridge is at the end of its servicable life. Replacement is scheduled.

The scope of works includes demolition of the existing timber bridge and replacement with an 8m wide 20m long (2 span) conventional concrete bridge with guardrails. The bridge will be approximately at the same height of the exisiting bridge. The new bridge will require the installation of new piers and end abutments. The 100m road approaches each side of the abutment will be designed to suit the speed enviroment of the road.

Total cost of proposed project is $1,800,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.