• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2017 - Sep 2017
  • Estimated project cost $158,000
  • Australian Government contribution $158,000
  • Local Council/Shire Central Goldfields Shire Council
  • State VIC

Project description

George Street is a Rural Access 1 road in a rural residential environment where the existing road consists of 450 metres length of unsealed road, which is 6.5 metres wide, is continually deteriorated due to poor drainage and poor pavement materials.

The existing unsealed road pavement is to be re-profiled and widened and strengthened with a deeper pavement, 7 metres wide and sealed to 4 metres wide.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.