• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2016 - Feb 2017
  • Estimated project cost $901,626
  • Australian Government contribution $305,000
  • State NSW

Project description

The road is narrow with a crest within this section. There is no formal footway & parking is hap-hazard. Residents have reported numerous accident near misses. The road is dangerous in its current condition and alignment.

Reconstruct the road over a length of 590 meters at an average width of 9.0 metres. Construct stormwater drainage, footpath on south side and kerb and gutter on both sides. Numerous driveway level adjustments required. Construct retaining wall as required on south side.

Total cost of proposed project is $901,626

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.