• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2018 - Jun 2018
  • Estimated project cost $122,682
  • Australian Government contribution $122,682
  • State NSW

Project description

Bitumen surface has lost its original shape, deformed and hold water when wet. Edge break has occurred to bitumen surface and constant maintenance required .

Remove the existing bitumen seal. Rework and widen road formation to minimum of 4.5m from the centre line. Incorporate 2% lime stabilising agent into the pavement material. Compact pavement and Spray 7m wide 10mm primer seal. Install guide posts and required road signs.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.