• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2016 - Jan 2017
  • Estimated project cost $579,777
  • Australian Government contribution $531,000
  • Local Council/Shire Monash City Council
  • State VIC

Project description

Sherwood Road is a concrete road that was constructed around 1929-1930 and is now in poor condition with significant cracks and a large number of patches that are increasing in number over time as parts of the road fail. The existing surface is very rough in a number of locations.

The reconstruction of the existing concrete road pavement to address its current poor condition and improve the drainage of the road surface. The road will be sloped to allow it to drain correctly into the existing kerb and channel which was reconstructed earlier in an attempt to correct this fault. The road width is to be maintained as the kerb and channel is not being removed. The length of road being reconstructed in Sherwood Road is approx. 745m in length.

Total cost of proposed project is $579,777

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.