• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2017 - Apr 2017
  • Estimated project cost $246,763
  • Australian Government contribution $246,763
  • State NSW

Project description

The existing road surface is affected by severe deformations, rutting and pavement failures. Multiple patches have made the road surface very rough.

The proposed work includes replacement of substandard pavement materials with asphalt and resurfacing of the road with hot mix asphalt. Length = 175 m; Width = 12.2 m; Area = 2135 m2

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.