• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2016 - Oct 2017
  • Estimated project cost $612,119
  • Australian Government contribution $398,693
  • Local Council/Shire Tenterfield Shire Council
  • State NSW

Project description

The existing timber bridge has a 10 tonne load limit because it has deteriorated significantly. The length of the bridge is 28 metres and the width is 5.4 metres.

The entire bridge is being upgraded to comprise a concrete substructure with modular timber deck.

Total cost of proposed project is $612,119

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.