• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2016 - Mar 2018
  • Estimated project cost $112,502
  • Australian Government contribution $112,502
  • Local Council/Shire Warrumbungle Shire Council
  • State NSW

Project description

The surface of Wyuna Road in the proposed work location is unsealed and does not have sufficient road base depth, which results in pothole and ruts causing a reduction in speed for vehicles travelling the road. Furthermore, the existing surface becomes slippery during and immediately after rainfall.

Overlay the surface of a 8.0km length of Wyuna Road with 100mm compacted road base material.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.