• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2017 - Aug 2017
  • Estimated project cost $850,685
  • Australian Government contribution $850,685
  • Local Council/Shire Shire of Menzies
  • State WA

Project description

Menzies North West road has deteriorated through loss of fines resulting in the inability to maintain the surface in a bound condition leading to surface failures such as potholes and corrugations. The road requires reconstruction and reconditioning of pavement using a suitable gravel and bitumen sealing. The horizontal and vertical geometry will also be addressed to improve driver safety.

Reconstruct and recondition pavement and bitumen seal including horizontal and vertical geometry improvement.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.